GrowerSELECT HSES Evaporative Cooling System Installation Manual

Hog Slat Inc. Newton Grove, NC USA March 2022 32 Evaporative Cooling System Level Rite Electronic Float Management System HSCC-1000, HSPK-JETLR 1. Determine installation position of incoming fill taking into account the following Incoming water supply should be closely located to the Assembly. If possible it is recommended to install float switches on the flush end cap. ! A DEDICATED POWER OUTLET IS REQUIRED FOR CORRECT OPERATION ! THIS POWER OUTLET SHOULD REMAIN “ON” CONTINUOUSLY. THE FILL CONTROL SYSTEM SHOULD REMAINED POWERED ON ANYTIME THE SYSTEM HAS WATER IN IT. 2. Open the control box (HSCC-1000) and remove the float switch assemblies. Weatherproof wire nuts are included in the float switch boxes. 3. Mark location for float switch installation on either the flush end cap or the trough itself. See image below for dimensions. 4. Drill float switch mounting holes to 0.625” (5/8”)