Hog Slat Inc. Newton Grove, NC USA SEPT 2025 REV A2 10 Ventilation System 8. Connect the BLUE wire from the auxiliarly power supply to the Neutral or L2 input on the bottom board. Connect the Brown wire from the auxiliarly power supply to the L1 input terminal. If supply wire going to controller is 12 AWG, place brown and blue wires underneath the same side of the clamp as the 12 AWG wire. If the smaller wires are on the opposite side of the terminal wire clamp, the small brown or blue wires will be left loose and will not be a stable connection. 9. Close the front door and set latch on the enclosure. Re-connect the power to the controller. On initial power up the controller will require minimum set up before activating the controller for operation. This is similar to setting DIP switches except the set up occurs through the touchscreen. It is important to perform the initial set up so that the operation of the controller is predictable. Simply follow the instructions below found in SECTION 9. NOTE: The controller by default is set up with all cooling stages (no heat). If you press the activation icon before you have performed the minimum setup in SECTION 9, the controller will default to one probe input, no heat, no mist and all stages will be cooling. You can easily change any set up at any time. SECTION 6 & 7: WIRING INSTRUCTIONS Reference Section 5 relative to secondary power supply connection and ribbon cable installation. No other connections are required.
RkJQdWJsaXNoZXIy MTA3MzU=