Hog Slat Inc. Newton Grove, NC USA SEPT 2025 REV A2 3 Ventilation System CURTAIN OPERATION 17 CURTAIN MACHINE OPERATION 17 DEAD BAN 17 CYCLE TIME 17 COMPENSATION (AUTO TIME ADJUST) 18 COOLING PAGE 18 STAGE 1 THROUGH STAGE 3 18 STAGE 3 FLOATING OR NON-FLOATING 19 HEAT PAGE 19 SELECT HEATING STAGES 20 SELECT HEAT TYPE (ZONES) 20 MAX TEMPERATURE DIFFERENCE (ZONES) 21 HEATER 1 AND HEATER 2 ZONE SETTINGS 21 SELECT HEAT TYPE (CASCADING) 21 HEATER 1 AND HEATER 2 SETTINGS (CASCADING) 22 HEATER RUN TIME 22 MIST COOLING PAGE 23 MIST ON / OFF TIME 23 MAXIMUM HUMIDITY CUT OFF 23 MIST OFFSET / DIFFERENTIAL 23 ALARM PAGE 23 EMPTY BARN LOW TEMP ALARM 24 ALARM STATUS 24 ALARM HIGH/ALARM LOW 24 CRITCAL HIGH ALARM TEMPERATURE 24
RkJQdWJsaXNoZXIy MTA3MzU=