Hog Slat Inc. Newton Grove, NC USA AUG 2025 REV A2 3 Ventilation System CURTAIN OPERATION 17 CURTAIN MACHINE OPERATION 17 DEAD BAN 17 CYCLE TIME 17 COMPENSATION (AUTO TIME ADJUST) 17 COOLING PAGE 18 STAGE 1 THROUGH STAGE 3 18 STAGE 3 FLOATING OR NON-FLOATING 19 HEAT PAGE 19 SELECT HEATING STAGES 20 SELECT HEAT TYPE (ZONES) 20 MAX TEMPERATURE DIFFERENCE (ZONES) 20 HEATER 1 AND HEATER 2 ZONE SETTINGS 20 SELECT HEAT TYPE (CASCADING) 21 HEATER 1 AND HEATER 2 SETTINGS (CASCADING) 21 HEATER RUN TIME 22 MIST COOLING PAGE 22 MIST ON / OFF TIME 22 MAXIMUM HUMIDITY CUT OFF 22 MIST OFFSET / DIFFERENTIAL 22 ALARM PAGE 23 EMPTY BARN LOW TEMP ALARM 23 ALARM STATUS 23 ALARM HIGH/ALARM LOW 23 CRITCAL HIGH ALARM TEMPERATURE 23
RkJQdWJsaXNoZXIy MTA3MzU=