Hog Slat Feed Bin Installation Operation English Manual

Hog Slat Inc. Newton Grove, NC USA Sept. 2021 15 Feed Bins Hopper Panels 1. Begin caulking around the inside of the bottom row of holes on the bottom ring of corrugated side wall sheets. 2. Caulk the hopper panel sheets along the vertical edge with the bend towards the outside. Caulk all hoppers panels on the same inside edge and apply to both sides of holes. 3. Align the center of the first hopper panel section with any of the vertical seams on the top ring and assemble to inside of corrugated sidewall sheets using HS712 Hex Bin Bolts and the HS722 Hex Nuts. 4. Continue around until all but one hopper panel are assembled and bolts tightened. Hopper Reinforcement Angle GST-HR960 for 9’ 3-6 ring tanks GST-HR1260 for 12’ 3-6 ring tanks Caulk 5. Before installing the last hopper panel. Apply caulk on both sides of the holes on the hopper collar and insert into the flanged end of the assembled hopper panels. 6. Bolt the hopper collar to the hopper panel flange using HS714 Truss head bins bolts and HS722 Flange nuts. Truss heads to the inside. Vertical Seam 3/8 Round Hole

RkJQdWJsaXNoZXIy MTA3MzU=