Hog Slat Feed Bin Installation Operation English Manual

Hog Slat Inc. Newton Grove, NC USA Sept. 2021 18 Feed Bins Lid Assembly Installation 1. Thread the HS719 5/16-20 nut onto the HS804 Eyebolt and thread the eyebolt completely into the lid assembly using the HS719 as a jam nut. 2. Place lid assembly over peak ring and loosely secure with the 607065 3/8” x 3.5” Carriage bolt and 60682 Lock nut (tighten the band together by hand so the lid will rotate freely). You will tighten at step 9. 3. Slide the spring onto the Pivot Bushing and snap the loop over the 3/8 pivot rod. 4. Using pliers grip the outer end of the spring and rotate around until the end of the spring end rod is aligned with the bushing slot. Slide the spring end rod completely into the slot. 5. Rotate lid assembly as needed to access other spring and repeat step 4 Spring Loop 607065 Carriage Bolt HS804 Eyebolt The Clamp Band must be between the formed ribs. 60682 Locknut Formed Ribs Notice: The lids are shipped with the springs uninstalled for ease of installation HS719 5/16-20 Nut Spring End Rod GST-LD3062R GST-LD3062L

RkJQdWJsaXNoZXIy MTA3MzU=