Hog Slat Feed Bin Installation Operation English Manual

Hog Slat Inc. Newton Grove, NC USA Sept. 2021 19 Feed Bins 6. Thread the Pull Cable loop up through the grommet at the eave and attach to the lid eyebolt using the GST-LD3033 carabiner. 7. With the lid in full open position - Slip the Lock Collar over the cable and tighten just under the GST-LD1011 Guide bracket to lock the lid in the open position. 8. Loop the cable through the GST-LD1013 tube until the desired height and secure with 617321 Cable Clamp. Trim off excess cable. 9. Rotate lid to align the wheel and eyebolt with the grommet attached to roof eave and tighten completely. GST-LD1013 tube 617321 Cable Clamp GST-LD2041 Lock Collar (Set with lid at full open) The Lid Eyebolt must be aligned with the grommet. Do not over tighten Clamp Band to where the flanges are bent inward. GST-LD3033 Carabiner Clip GST-LD1011 Guide

RkJQdWJsaXNoZXIy MTA3MzU=